Page Level Ads

Question From Readers #14: Calculate Cargo To Be Loaded


Find The Cargo To Be Loaded


Find the cargo to be loaded if initial draft aft is 10.873m, Trim Corr. = 14.408, TPC = 38.37 and final draft aft = 10.9m.
Ans. 89.19tons

Solution:

1. Subtract final draft and initial draft.
               10.9 m
             - 10.873 m  
                0.027 m 
2. Convert the 0.027 meter difference into centimeter so that we can apply the TPC.
               0.027 m x 100 cm = 2.7 cm 
                              1
3. Multiply the TPC by 2.7 to get tons of cargo.
              38.37 
             x 2.7    
            103.599 tons     
         -   14.408    trim correction
            89.191 tons of cargo to be loaded  
If you find this helpful, please click the share button below to share this post to your friends. Sharing is caring...

No comments:

Post a Comment