Question From Readers #14: Calculate Cargo To Be Loaded


Find The Cargo To Be Loaded


Find the cargo to be loaded if initial draft aft is 10.873m, Trim Corr. = 14.408, TPC = 38.37 and final draft aft = 10.9m.
Ans. 89.19tons

Solution:

1. Subtract final draft and initial draft.
               10.9 m
             - 10.873 m  
                0.027 m 
2. Convert the 0.027 meter difference into centimeter so that we can apply the TPC.
               0.027 m x 100 cm = 2.7 cm 
                              1
3. Multiply the TPC by 2.7 to get tons of cargo.
              38.37 
             x 2.7    
            103.599 tons     
         -   14.408    trim correction
            89.191 tons of cargo to be loaded  